The first project has been executed at the headquarter in Berlin (Wedding).
This plant is dedicated to produce the global Schering demand of liquid forms.
The project incorporates 600 IO's with 20 METONE particles counters.
60 online users are connected via Schering intranet to interact with the
SYCLEAN monitoring system.
The second project, which is under construction, is to equip the
logistic center with SYCLEAN.
It includes a warehouse based in Velten (25 Km in the north of Berlin)
and the supply center in Wedding (Berlin).
Beside the 20 additionnal online user via intranet,
SyCLEAN can also exchange real time data among this two sites.
This performance is enabled due to SYCLEAN's scalability and an open architecture.
|
|
![[Syte]](../images/syte-s-tr.png)
![[banner]](../images/banner1.png)
The first project has been executed at the headquarter in Berlin (Wedding).
This plant is dedicated to produce the global Schering demand of liquid forms.
The project incorporates 600 IO's with 20 METONE particles counters.
60 online users are connected via Schering intranet to interact with the
SYCLEAN monitoring system.